Lugovskoye Field: Science and Technology Center Joins Assembly of the MTT System

Specialists from the Science and Technology Center have arrived at the Lugovskoye field to carry out part of the installation supervision work and provide scientific and engineering support for the assembly of the MTT fleet’s integrated process system.



Block-mounted pumping units had previously been installed and the process piping connected at the site. The Center’s team has now joined the next stage of system assembly.

Wiring and termination of instrumentation and automation equipment is underway. This equipment monitors and controls processes across all units of the system. Meanwhile, the Center’s specialists are reviewing documentation and testing software, checking the correctness of control algorithms, sensor settings, and interactions between automation systems.

This is a key stage before commissioning. The stability of the entire MTT system depends on the quality of instrumentation and automation wiring and configuration.

Work is proceeding on schedule. We will provide regular updates on the next stages.

Other articles