Lugovskoye Field: Tank Farm Development Continues

Work at the Lugovskoye field is continuing in preparation for pilot industrial testing of the HT complex. At the current stage, utility lines are being laid for the piping connections of the tank farm.



Earthworks are under way at the site to lay cable routes and oil transfer hoses to fuel tank E-04, which supplies fuel to the generator. This is necessary to ensure the integrity and safe operation of the utility lines in areas used by heavy-duty vehicles.



Water supply works are also continuing: instrumentation and automation connections for tanks E-01, E-02, E-03 and E-05 have been completed for water service, including the connection of liquid level sensors. High-high level alarms have also been installed.

Work is proceeding as planned. Further updates on the next stages will be provided separately.